Strata electrical planning report
To plan for increased electrical demand – including electric vehicle (EV) charging and heat pumps – strata corporations with five or more strata lots, are required to obtain an electrical planning report by December 31, 2026 or December 31, 2028 depending on where the strata corporation is located in British Columbia. An electrical planning report must provide information about:
President of Merka Building Solutions will be teaching HVAC Systems Design at BCIT.
Use the link below for registration: Air Conditioning Systems 1 (MSYS 3020) – BCIT
Compressed Air Systems and Energy
Watch the video below to see how compressed air systems play a role in the energy consumption of your facility.
An Energy Audit Success Story
See the video below on how we can help with your facility’s energy management:
City of Vancouver Energy Reporting for 2025
The city of Vancouver’s Energy and Carbon reporting for 2025 includes the below buildings and the deadline is June 1, 2025: • Commercial buildings 50,000 square feet or greater • Residential buildings and hotels 100,000 square feet or greater Contact us for helping you with your reporting.